Moscow

RUSSIA’s Central Suburban Passenger Company (CSPC) has placed an order with Transmashholding subsidiary Demikhovsky Machine Building Plant (DMZ) for 10 additional type EP2D EMUs for use on suburban services in…
TVER Carriage Works (TVZ), a subsidiary of Transmashholding, was announced on March 5 as the sole bidder for a tender launched in December 2017 by Moscow commuter rail operator Central…
THE mayor of Moscow Mr Sergey Sobyanin and Russia’s special presidential representative for environmental protection Mr Sergey Ivanov attended a ceremony on February 26 to mark the inauguration of the…
RUSSIAN airport rail link operator Aeroexpress introduced its new fleet of Stadler ESh2 Kiss double-deck EMUs on October 27, when Russian transport minister Mr Maksim Sokolov attended a ceremony at…
MOSCOW metro has awarded Metrowagonmash a 27-year lifecycle contract to maintain 50 type 81-760 and 81-761 metro trains.
MOSCOVITES got their first taste of the Russian capital’s next generation tram on March 17, when the city’s mayor Mr Sergey Sobyanin marked the introduction of two prototype Vityaz-M vehicles…
MOSCOW metro extended the western leg of the east -west Line 8 on March 16 with the start of passenger services on the 7.3km Park Pobedy - Ramenki stretch of…
THE first of 96 new-generation trains being built Metrowagonmash for Moscow Metro arrived at the city’s Vykhino depot at the end of January.
RUSSIAN Railways (RZD) announced on January 10 that Sapsan high-speed trains carried 4.8 million passengers in 2016, 37.4% more than in 2015.
A TOTAL of 6.1 million passengers were carried during the first month of operation on the Moscow central ring railway.
Start
Prev
1
Page 1 of 5

Get the latest rail news

IRJ Rail Brief newsletter covers global railway news